HR 3301 · 113th Congress 2013–2015, ended

North American Energy Infrastructure Act

Latest action · Jun 26, 2014 Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 442.

Progress

Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.

  1. IntroducedOct 22, 2013
  2. Passed HouseJun 24, 2014
  3. Passed SenateNot reached
  4. To the PresidentNot reached
  5. Became lawNot reached

Summary

North American Energy Infrastructure Act - (Sec. 3) Prohibits any person from constructing, connecting, operating, or maintaining a cross-border segment of an oil or natural gas pipeline or electric transmission facility at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico without obtaining a certificate of crossing under this Act.

Requires the Secretary of State, with respect to oil pipelines, or the Secretary of Energy (DOE), with respect to electric transmission facilities, to issue a certificate of crossing for the cross-border segment within 120 days after final action is taken under the National Environmental Policy Act of 1969 (NEPA), unless it is not in U.S. public interest.

Directs DOE, as a condition of issuing a certificate, to require that the cross-border segment be constructed, connected, operated, or maintained consistent with the policies and standards of: (1) the Electric Reliability Organization and the applicable regional entity, and (2) any Regional Transmission Organization or Independent System Operator with operational or functional control over the segment.

Exempts from such requirement any construction, connection, operation, or maintenance of a cross-border segment if: (1) it is operating for import, export, or electrical transmission upon the date of enactment of this Act; (2) the relevant permit or certificate of crossing has previously been issued under this Act; or (3) an permit application is pending on the date of enactment of this Act, until it is denied or July 1, 2016, whichever occurs first.

Retains: (1) the requirement to obtain approval or authorization under the Natural Gas Act for the siting, construction, or operation of any facility to import or export natural gas, and (2) certain authority of the President under the Energy Policy and Conservation Act (EPCA).

(Sec. 4) Amends the Natural Gas Act to declare that no order of the Federal Energy Regulatory Commission (FERC) is required for the export or import of natural gas to or from Canada or Mexico.

(Sec. 5) Amends the Federal Power Act to repeal the requirement that the transmission of electric energy to a foreign country necessitates prior authorization by FERC.

(Sec. 6) Declares that no Presidential permit shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, including any cross-border segment.

(Sec. 7) Declares that no certificate of crossing or permit shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility that: (1) operates for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of this Act; (2) for which a permit for such construction, connection, operation, or maintenance has been issued; or (3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued.

(Sec. 8) Sets forth deadlines for rulemaking.

Recorded votes 5

Newest first. Open one to see how every member voted.

Roll callQuestionResultDate
House 354Passed238–173Jun 24, 2014
House 353Failed185–227Jun 24, 2014
House 352Failed176–234Jun 24, 2014
House 351On Agreeing to the AmendmentFailed171–240Jun 24, 2014

Yea 171

Nay 240

House 350Failed176–233Jun 24, 2014

Cosponsors 20

Members who signed on, in the order they did. Signatures ran from Oct 22, 2013 to Jun 10, 2014; 15 are original cosponsors, there from the day it was introduced.

SeatCosponsorSigned on
R-WACathy McMorris RodgersOriginalOct 22, 2013
R-NYChris CollinsOriginalOct 22, 2013
D-MNCollin C. PetersonOriginalOct 22, 2013
R-KYEd WhitfieldOriginalOct 22, 2013
D-TXFilemon VelaOriginalOct 22, 2013
D-TXGene GreenOriginalOct 22, 2013
D-TXHenry CuellarOriginalOct 22, 2013
D-CAJim CostaOriginalOct 22, 2013
D-UTJim MathesonOriginalOct 22, 2013
R-TXJoe BartonOriginalOct 22, 2013
R-NDKevin CramerOriginalOct 22, 2013
R-NELee TerryOriginalOct 22, 2013
R-KSMike PompeoOriginalOct 22, 2013
D-TXPete P. GallegoOriginalOct 22, 2013
D-TXRuben HinojosaOriginalOct 22, 2013

Committees 3

Where it was sent and what each committee and subcommittee did with it, in order.

ChamberCommitteeWhat it did
HouseEnergy and Commerce Committee
Referred Oct 22, 2013Markup May 8, 2014Reported Jun 20, 2014
Energy Subcommittee
Referred Oct 25, 2013Markup Nov 20, 2013Reported Nov 20, 2013
HouseTransportation and Infrastructure Committee
Referred Oct 22, 2013Discharged Jun 20, 2014
Railroads, Pipelines, and Hazardous Materials Subcommittee
Referred Oct 23, 2013
HouseNatural Resources Committee
Referred Oct 22, 2013Discharged Jun 20, 2014
Federal Lands Subcommittee
Referred Oct 24, 2013

Actions 45

Everything that happened, newest first.

  1. Jun 26, 2014Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 442.
  2. Jun 25, 2014Received in the Senate. Read the first time. Placed on Senate Legislative Calendar under Read the First Time.
  3. Jun 24, 2014Rule H. Res. 636 passed House.
  4. Jun 24, 2014Considered under the provisions of rule H. Res. 636. (consideration: CR H5665-5676)
  5. Jun 24, 2014The resolution provides for consideration of H.R. 6 and H.R. 3301. For H.R. 6, one hour of general debate and amendments are confined to those printed in part A of the report accompanying the resolution. For H.R. 3301, one hour of general debate and amendments are confined to those printed in part B of the report accompanying the resolution.

In the Congressional Record 8

Days the Record’s own index lists this bill, newest first, with the pages and the members it names. Pages starting H are the House, S the Senate, E Extensions of Remarks.

WhereIn the RecordMembersDate
ExtensionsDebate and remarks E1093Chris Van Hollen D-MDJun 30, 2014
SenateDebate and remarks S4095Harry Reid D-NVJun 26, 2014
SenateDebate and remarks S4092Harry Reid D-NVJun 25, 2014
HouseDebate and remarks H5646, H5652–H5659, H5664, H5665–H5676, H5683–H5688Text printed H5652, H5672Amendments H5658, H5672, H5673, H5674, H5675Motions H5686Recorded votes H5658, H5659, H5684, H5685, H5687consideration (H. Res. 636), previous questionSchneider motion to recommit (prohibit approval of oil or natural gas pipelines that have potential to contaminate the Great Lakes or a drinking water supply)Pallone amendment (ensure the complete length of cross-border natural gas pipelines would be subject to full environmental review under the National Environmental Policy Act)Waxman amendment (exclude any cross-border natural gas pipelines project with a pending permit application from new approval requirements)Bill Cassidy R-LA, Bob Goodlatte R-VA, Bradley Scott Schneider D-IL (motion), Chellie Pingree D-ME, Ed Whitfield R-KY, Frank D. Lucas R-OK, Frank Pallone, Jr. D-NJ (amendment), Fred Upton R-MI, Gene Green D-TX, Gus M. Bilirakis R-FL, Henry A. Waxman D-CA (amendment), James P. McGovern D-MA (amendment), Janice D. Schakowsky D-IL, Jim Matheson D-UT, Lee Terry R-NE, Lois Capps D-CA, Michael C. Burgess R-TX, Paul Tonko D-NY, Pete P. Gallego D-TX, Peter Welch D-VT (amendment), Robert E. Latta R-OHJun 24, 2014
HouseDeclaratory Statements H5641—Jun 23, 2014

Research

What has been written about this bill: committee reports, cost estimates, the sponsor’s authority statement, printed hearings and the Congressional Research Service’s work.

Committee report

Congressional Budget Office cost estimate

  1. May 29, 2014H.R. 3301, North American Energy Infrastructure ActAs ordered reported by the House Committee on Energy and Commerce on May 8, 2014

Constitutional authority

Congress has the power to enact this legislation pursuant to the following: Article I, Section 8, Clause 3 of the United States Constitution.

The sponsor’s statement, as printed in the page H6676.

Printed hearings 3

Hearings whose printed record names this bill, newest first: hearings on it, and wider hearings where it came up.

NumberHearingCommitteeHeld
Serial No. 113-124BENEFITS OF AND CHALLENGES TO ENERGY ACCESS IN THE 21ST CENTURY: FUEL SUPPLY AND ENERGY INFRASTRUCTURE236 pagesEnergy and Commerce CommitteeMar 6, 2014
Serial No. 113-106EVALUATING THE ROLE OF FERC IN A CHANGING ENERGY LANDSCAPE149 pagesEnergy and Commerce CommitteeDec 5, 2013
Serial No. 113-88THE NORTH AMERICAN ENERGY INFRASTRUCTURE ACT195 pagesEnergy and Commerce CommitteeOct 29, 2013

CRS reports 4

Congressional Research Service work that CRS links to this bill or the law it became, newest first.

Cite it 4

Products on other subjects that cite it, usually among other measures.

Amendments 4

Amendments offered to this bill.

AmendmentDescriptionOffered byStatus
HAmdt 955Amendment sought to ensure that the complete length of cross-border projects would be subject to full environmental review under the National Environmental Policy Act (NEPA).Frank Pallone, Jr. D-NJOn agreeing to the Pallone amendment (A001) Failed by recorded vote: 176 - 233 (Roll no. 350).
HAmdt 956Amendment sought to exclude any project with a pending permit application from the new approval requirements in the bill.Henry A. Waxman D-CAOn agreeing to the Waxman amendment (A002) Failed by recorded vote: 171 - 240 (Roll no. 351).
HAmdt 957Amendment sought to ensure that pipeline modifications receive a thorough environmental review process.Peter Welch D-VTOn agreeing to the Welch amendment (A003) Failed by recorded vote: 176 - 234 (Roll no. 352).
HAmdt 958No description on fileRules CommitteeHouse amendment offered

Related bills 4

Companion bills and other measures the record links to this one.

Titles 4

Every title it has carried, official and short, at each stage.

Official Title as Introduced
To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.
Short Titles as Introduced
North American Energy Infrastructure Act
Short Titles as Reported to House
North American Energy Infrastructure Act
Short Titles as Passed House
North American Energy Infrastructure Act

Subjects

Assigned by the Library of Congress. Policy area: Energy.

Text 4

Each version as it was printed, newest first.

  1. Jun 26, 2014Placed on Calendar Senate
  2. Jun 24, 2014Engrossed in House
  3. Jun 19, 2014Reported in House
  4. Oct 22, 2013Introduced in House

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details.

Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.