North American Energy Infrastructure Act
Latest action · Jun 26, 2014 Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 442.
Progress
Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.
- IntroducedOct 22, 2013
- Passed HouseJun 24, 2014
- Passed SenateNot reached
- To the PresidentNot reached
- Became lawNot reached
Summary
North American Energy Infrastructure Act - (Sec. 3) Prohibits any person from constructing, connecting, operating, or maintaining a cross-border segment of an oil or natural gas pipeline or electric transmission facility at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico without obtaining a certificate of crossing under this Act.
Requires the Secretary of State, with respect to oil pipelines, or the Secretary of Energy (DOE), with respect to electric transmission facilities, to issue a certificate of crossing for the cross-border segment within 120 days after final action is taken under the National Environmental Policy Act of 1969 (NEPA), unless it is not in U.S. public interest.
Directs DOE, as a condition of issuing a certificate, to require that the cross-border segment be constructed, connected, operated, or maintained consistent with the policies and standards of: (1) the Electric Reliability Organization and the applicable regional entity, and (2) any Regional Transmission Organization or Independent System Operator with operational or functional control over the segment.
Exempts from such requirement any construction, connection, operation, or maintenance of a cross-border segment if: (1) it is operating for import, export, or electrical transmission upon the date of enactment of this Act; (2) the relevant permit or certificate of crossing has previously been issued under this Act; or (3) an permit application is pending on the date of enactment of this Act, until it is denied or July 1, 2016, whichever occurs first.
Retains: (1) the requirement to obtain approval or authorization under the Natural Gas Act for the siting, construction, or operation of any facility to import or export natural gas, and (2) certain authority of the President under the Energy Policy and Conservation Act (EPCA).
(Sec. 4) Amends the Natural Gas Act to declare that no order of the Federal Energy Regulatory Commission (FERC) is required for the export or import of natural gas to or from Canada or Mexico.
(Sec. 5) Amends the Federal Power Act to repeal the requirement that the transmission of electric energy to a foreign country necessitates prior authorization by FERC.
(Sec. 6) Declares that no Presidential permit shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, including any cross-border segment.
(Sec. 7) Declares that no certificate of crossing or permit shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility that: (1) operates for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of this Act; (2) for which a permit for such construction, connection, operation, or maintenance has been issued; or (3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued.
(Sec. 8) Sets forth deadlines for rulemaking.Recorded votes 5
Newest first. Open one to see how every member voted.
| Roll call | Question | Result | Date |
|---|---|---|---|
| House 354 | On Passage | Passed238–173 | Jun 24, 2014 |
| House 353 | On Motion to Recommit with Instructions | Failed185–227 | Jun 24, 2014 |
| House 352 | On Agreeing to the Amendment | Failed176–234 | Jun 24, 2014 |
| House 351 | On Agreeing to the Amendment | Failed171–240 | Jun 24, 2014 |
| House 350 | On Agreeing to the Amendment | Failed176–233 | Jun 24, 2014 |
Cosponsors 20
Members who signed on, in the order they did. Signatures ran from Oct 22, 2013 to Jun 10, 2014; 15 are original cosponsors, there from the day it was introduced.
| Seat | Cosponsor | Signed on | |
|---|---|---|---|
| R-WA | Cathy McMorris Rodgers | Original | Oct 22, 2013 |
| R-NY | Chris Collins | Original | Oct 22, 2013 |
| D-MN | Collin C. Peterson | Original | Oct 22, 2013 |
| R-KY | Ed Whitfield | Original | Oct 22, 2013 |
| D-TX | Filemon Vela | Original | Oct 22, 2013 |
| D-TX | Gene Green | Original | Oct 22, 2013 |
| D-TX | Henry Cuellar | Original | Oct 22, 2013 |
| D-CA | Jim Costa | Original | Oct 22, 2013 |
| D-UT | Jim Matheson | Original | Oct 22, 2013 |
| R-TX | Joe Barton | Original | Oct 22, 2013 |
| R-ND | Kevin Cramer | Original | Oct 22, 2013 |
| R-NE | Lee Terry | Original | Oct 22, 2013 |
| R-KS | Mike Pompeo | Original | Oct 22, 2013 |
| D-TX | Pete P. Gallego | Original | Oct 22, 2013 |
| D-TX | Ruben Hinojosa | Original | Oct 22, 2013 |
Committees 3
Where it was sent and what each committee and subcommittee did with it, in order.
| Chamber | Committee | What it did |
|---|---|---|
| House | Energy and Commerce Committee | Referred Oct 22, 2013Markup May 8, 2014Reported Jun 20, 2014 |
| Energy Subcommittee | Referred Oct 25, 2013Markup Nov 20, 2013Reported Nov 20, 2013 | |
| House | Transportation and Infrastructure Committee | Referred Oct 22, 2013Discharged Jun 20, 2014 |
| Railroads, Pipelines, and Hazardous Materials Subcommittee | Referred Oct 23, 2013 | |
| House | Natural Resources Committee | Referred Oct 22, 2013Discharged Jun 20, 2014 |
| Federal Lands Subcommittee | Referred Oct 24, 2013 |
Actions 45
Everything that happened, newest first.
- Jun 26, 2014Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 442.
- Jun 25, 2014Received in the Senate. Read the first time. Placed on Senate Legislative Calendar under Read the First Time.
- Jun 24, 2014Rule H. Res. 636 passed House.
- Jun 24, 2014Considered under the provisions of rule H. Res. 636. (consideration: CR H5665-5676)
- Jun 24, 2014The resolution provides for consideration of H.R. 6 and H.R. 3301. For H.R. 6, one hour of general debate and amendments are confined to those printed in part A of the report accompanying the resolution. For H.R. 3301, one hour of general debate and amendments are confined to those printed in part B of the report accompanying the resolution.
In the Congressional Record 8
Days the Record’s own index lists this bill, newest first, with the pages and the members it names. Pages starting H are the House, S the Senate, E Extensions of Remarks.
| Where | In the Record | Members | Date |
|---|---|---|---|
| Extensions | Debate and remarks E1093 | Chris Van Hollen D-MD | Jun 30, 2014 |
| Senate | Debate and remarks S4095 | Harry Reid D-NV | Jun 26, 2014 |
| Senate | Debate and remarks S4092 | Harry Reid D-NV | Jun 25, 2014 |
| House | Debate and remarks H5646, H5652–H5659, H5664, H5665–H5676, H5683–H5688Text printed H5652, H5672Amendments H5658, H5672, H5673, H5674, H5675Motions H5686Recorded votes H5658, H5659, H5684, H5685, H5687consideration (H. Res. 636), previous questionSchneider motion to recommit (prohibit approval of oil or natural gas pipelines that have potential to contaminate the Great Lakes or a drinking water supply)Pallone amendment (ensure the complete length of cross-border natural gas pipelines would be subject to full environmental review under the National Environmental Policy Act)Waxman amendment (exclude any cross-border natural gas pipelines project with a pending permit application from new approval requirements) | Bill Cassidy R-LA, Bob Goodlatte R-VA, Bradley Scott Schneider D-IL (motion), Chellie Pingree D-ME, Ed Whitfield R-KY, Frank D. Lucas R-OK, Frank Pallone, Jr. D-NJ (amendment), Fred Upton R-MI, Gene Green D-TX, Gus M. Bilirakis R-FL, Henry A. Waxman D-CA (amendment), James P. McGovern D-MA (amendment), Janice D. Schakowsky D-IL, Jim Matheson D-UT, Lee Terry R-NE, Lois Capps D-CA, Michael C. Burgess R-TX, Paul Tonko D-NY, Pete P. Gallego D-TX, Peter Welch D-VT (amendment), Robert E. Latta R-OH | Jun 24, 2014 |
| House | Declaratory Statements H5641 | — | Jun 23, 2014 |
Research
What has been written about this bill: committee reports, cost estimates, the sponsor’s authority statement, printed hearings and the Congressional Research Service’s work.
Committee report
Congressional Budget Office cost estimate
- May 29, 2014H.R. 3301, North American Energy Infrastructure ActAs ordered reported by the House Committee on Energy and Commerce on May 8, 2014
Constitutional authority
The sponsor’s statement, as printed in the page H6676.
Printed hearings 3
Hearings whose printed record names this bill, newest first: hearings on it, and wider hearings where it came up.
| Number | Hearing | Committee | Held |
|---|---|---|---|
| Serial No. 113-124 | BENEFITS OF AND CHALLENGES TO ENERGY ACCESS IN THE 21ST CENTURY: FUEL SUPPLY AND ENERGY INFRASTRUCTURE236 pages | Energy and Commerce Committee | Mar 6, 2014 |
| Serial No. 113-106 | EVALUATING THE ROLE OF FERC IN A CHANGING ENERGY LANDSCAPE149 pages | Energy and Commerce Committee | Dec 5, 2013 |
| Serial No. 113-88 | THE NORTH AMERICAN ENERGY INFRASTRUCTURE ACT195 pages | Energy and Commerce Committee | Oct 29, 2013 |
CRS reports 4
Congressional Research Service work that CRS links to this bill or the law it became, newest first.
Cite it 4
Products on other subjects that cite it, usually among other measures.
| Product | Title | Kind | Published |
|---|---|---|---|
| R43261 | Presidential Permits for Border Crossing Energy Facilities | Report | Aug 1, 2017 |
| R44140 | Presidential Permit Review for Cross-Border Pipelines and Electric Transmission | Report | Apr 19, 2017 |
| R43313 | Mexico’s Oil and Gas Sector: Background, Reform Efforts, and Implications for the United States Archived | Report | Sep 28, 2015 |
| R43787 | Keystone XL Pipeline: Overview and Recent Developments Archived | Report | Apr 1, 2015 |
Amendments 4
Amendments offered to this bill.
| Amendment | Description | Offered by | Status |
|---|---|---|---|
| HAmdt 955 | Amendment sought to ensure that the complete length of cross-border projects would be subject to full environmental review under the National Environmental Policy Act (NEPA). | Frank Pallone, Jr. D-NJ | On agreeing to the Pallone amendment (A001) Failed by recorded vote: 176 - 233 (Roll no. 350). |
| HAmdt 956 | Amendment sought to exclude any project with a pending permit application from the new approval requirements in the bill. | Henry A. Waxman D-CA | On agreeing to the Waxman amendment (A002) Failed by recorded vote: 171 - 240 (Roll no. 351). |
| HAmdt 957 | Amendment sought to ensure that pipeline modifications receive a thorough environmental review process. | Peter Welch D-VT | On agreeing to the Welch amendment (A003) Failed by recorded vote: 176 - 234 (Roll no. 352). |
| HAmdt 958 | No description on file | Rules Committee | House amendment offered |
Related bills 4
Companion bills and other measures the record links to this one.
Titles 4
Every title it has carried, official and short, at each stage.
- Official Title as Introduced
- To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.
- Short Titles as Introduced
- North American Energy Infrastructure Act
- Short Titles as Reported to House
- North American Energy Infrastructure Act
- Short Titles as Passed House
- North American Energy Infrastructure Act
Subjects
Assigned by the Library of Congress. Policy area: Energy.
- Administrative law and regulatory procedures
- Alaska
- Arizona
- California
- Canada
- Department of Commerce
- Department of Energy
- Electric power generation and transmission
- Energy
- Environmental assessment, monitoring, research
- Federal Energy Regulatory Commission (FERC)
- Idaho
- Latin America
- Licensing and registrations
- Maine
- Mexico
- Michigan
- Minnesota
- Montana
- New Hampshire
- New Mexico
- New York State
- North Dakota
- Ohio
- Oil and gas
- Pennsylvania
- Pipelines
- Presidents and presidential powers, Vice Presidents
- Texas
- Trade restrictions
- Vermont
- Washington State
Text 4
Each version as it was printed, newest first.
- Jun 26, 2014Placed on Calendar Senate
- Jun 24, 2014Engrossed in House
- Jun 19, 2014Reported in House
- Oct 22, 2013Introduced in House
Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.