EPA Regulatory Relief Act of 2011
Latest action · Oct 18, 2011 Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 201.
Progress
Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.
- IntroducedJun 21, 2011
- Passed HouseOct 13, 2011
- Passed SenateNot reached
- To the PresidentNot reached
- Became lawNot reached
Summary
(This measure has not been amended since it was reported to the House on September 26, 2011. The summary of that version is repeated here.)
EPA Regulatory Relief Act of 2011 - Provides that the following rules shall have no force or effect and shall be treated as though they had never taken effect: (1) the National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters; (2) the National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers; (3) the Standards of Performance for New Stationary Sources and Emission Guidelines for Existing Sources: Commercial and Industrial Solid Waste Incineration Units; and (4) Identification of Non-Hazardous Secondary Materials That are Solid Waste.
Requires the Administrator of the Environmental Protection Agency (EPA), in place of such rules, to promulgate and finalize on the date that is 15 months after the date of the enactment of this Act regulations for industrial, commercial, and institutional boilers and process heaters and commercial and industrial solid waste incinerator units subject to such rules, that: (1) establish maximum achievable control technology standards, performance standards, and other requirements for hazardous air pollutants or solid waste combustion under the Clean Air Act; and (2) identify non-hazardous secondary materials that, when used as fuels or ingredients in combustion units of such boilers, heaters, or incinerator units, are solid waste under the Solid Waste Disposal Act for purposes of determining the extent to which such combustion units are required to meet emission standards for such pollutants under such Act. Requires the Administrator to establish a date for compliance with standards and requirements under such regulations, which shall be no earlier than five years after such a regulation's effective date, after considering compliance costs, non-air quality health and environmental impacts and energy requirements, the feasibility of implementation, the availability of equipment, suppliers, and labor, and potential net employment impacts.
Treats the date on which the Administrator proposes such a regulation establishing an emission standard as the proposal date for purposes of applying the definition of a "new source" to hazardous air pollutants requirements or of a "new solid waste incineration unit" to solid waste combustion requirements under the Clean Air Act.
Requires the Administrator, in promulgating such regulations, to: (1) adopt the definitions of "commercial and industrial solid waste incineration unit," "commercial and industrial waste," and "contained gaseous material" in the rule entitled Standards for Performance of New Stationary Sources and Emission Guidelines for Existing Sources: Commercial and Industrial Solid Waste Incineration Units; (2) identify non-hazardous secondary material to be solid waste only if the material meets such definitions; (3) ensure that emissions standards for existing and new sources can be met under actual operating conditions consistently and concurrently with emission standards for all other air pollutants regulated by the rule for the source category, taking into account variability in actual source performance, source design, fuels, inputs, controls, ability to measure the pollutant emissions, and operating conditions; and (4) impose the least burdensome regulatory alternative.
Recorded votes 16
Newest first. Open one to see how every member voted.
| Roll call | Question | Result | Date |
|---|---|---|---|
| House 791 | On Passage | Passed— | Oct 13, 2011 |
| House 790 | On Motion to Recommit with Instructions | Failed— | Oct 13, 2011 |
| House 787 | On Agreeing to the Amendment | Failed— | Oct 13, 2011 |
| House 779 | On Agreeing to the Amendment | Failed— | Oct 11, 2011 |
| House 778 | On Agreeing to the Amendment | Failed— | Oct 11, 2011 |
Cosponsors 126
Members who signed on, in the order they did. Signatures ran from Jun 21, 2011 to Sep 22, 2011, with 7 there on the day it was introduced.
| Seat | Cosponsor | Signed on | |
|---|---|---|---|
| R-WA | Cathy McMorris Rodgers | Original | Jun 21, 2011 |
| D-NC | G. K. Butterfield | Original | Jun 21, 2011 |
| D-UT | Jim Matheson | Original | Jun 21, 2011 |
| D-GA | John Barrow | Original | Jun 21, 2011 |
| D-AR | Mike Ross | Original | Jun 21, 2011 |
| R-TX | Pete Olson | Original | Jun 21, 2011 |
| R-LA | Steve Scalise | Original | Jun 21, 2011 |
| R-IL | Adam Kinzinger | Jun 22, 2011 | |
| D-OK | Dan Boren | Jun 22, 2011 | |
| R-WI | Reid J. Ribble | Jun 22, 2011 | |
| D-PA | Tim Holden | Jun 22, 2011 | |
| R-CA | Wally Herger | Jun 22, 2011 | |
| R-OH | Bob Gibbs | Jun 23, 2011 | |
| R-KY | Ed Whitfield | Jun 23, 2011 | |
| R-WA | Jaime Herrera Beutler | Jun 23, 2011 |
Actions 83
Everything that happened, newest first.
- Oct 18, 2011Read the second time. Placed on Senate Legislative Calendar under General Orders. Calendar No. 201.
- Oct 17, 2011Received in the Senate. Read the first time. Placed on Senate Legislative Calendar under Read the First Time.
- Oct 13, 2011Considered as unfinished business. (consideration: CR H6881-6882)
- Oct 13, 2011Considered as unfinished business. (consideration: CR H6903-6906)
- Oct 13, 2011DEBATE - The House proceeded with 10 minutes of debate on the Castor motion to recommit. The instructions in the motion seek to report the same back to the House with an amendment to require the EPA Administrator not delay action to reduce air pollution from waste incinerators that are within 5 miles of any nursing home, assisted living facility or hospital. The amendment also states that any facility that will have regulation of its air pollutant emissions delayed is required to notify affected communities no later than 90 days after the date of enactment.
Related bills 8
Companion bills and other measures the record links to this one.
| Bill | Title | Relationship | Latest action |
|---|---|---|---|
| HRES 419 | Providing for consideration of the bill (H.R. 2681) to provide additional time for the Administrator of the Environmental Protection Agency to issue achievable standards for cement manufacturing facilities, and for other purposes, and providing for consid | Procedurally related | Oct 4, 2011 |
| S 1392 | EPA Regulatory Relief Act of 2011 | Related bill | Jul 20, 2011 |
| S 1610 | Cement Sector Regulatory Relief Act of 2011 | Related bill | Sep 22, 2011 |
| S 1786 | Long-Term Surface Transportation Extension Act of 2011 | Related bill | Nov 3, 2011 |
| S 1960 | Jobs Creation Act | Related bill | Dec 7, 2011 |
Subjects
Assigned by the Library of Congress. Policy area: Environmental Protection.
- Administrative law and regulatory procedures
- Air quality
- Energy efficiency and conservation
- Environmental Protection
- Environmental Protection Agency (EPA)
- Environmental regulatory procedures
- Environmental technology
- Hazardous wastes and toxic substances
- Industrial facilities
- Solid waste and recycling
Text 4
Each version as it was printed, newest first.
- Oct 18, 2011Placed on Calendar Senate
- Oct 13, 2011Engrossed in House
- Sep 26, 2011Reported in House
- Jun 21, 2011Introduced in House
Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov.