HR 5623 · 107th Congress 2001โ€“2003, ended

To provide for prioritization of transportation of nuclear waste from utilities to a permanent repository on the basis of renewable energy use.

Latest action · Oct 28, 2002 Referred to the Subcommittee on Energy and Air Quality.

Progress

Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.

  1. IntroducedOct 10, 2002
  2. Passed HouseNot reached
  3. Passed SenateNot reached
  4. To the PresidentNot reached
  5. Became lawNot reached

Summary

Amends the Nuclear Waste Policy Act of 1982 to direct the Secretary of Energy to establish a priority listing among utilities for the transportation of high-level radioactive waste and spent nuclear fuel from them to a specified permanent repository.

Mandates that the highest priority be assigned to utilities that derive the highest percentage of energy produced or sold from renewable energy resources, including solar, wind, ocean, or geothermal energy, biomass, landfill gas, a generation offset (reduced electricity usage metered at a site where a customer consumes energy from a renewable energy technology), or incremental hydropower.

Instructs the Secretary to: (1) establish the listing not later than one year before the projected date of the first transportation of high-level radioactive waste and spent nuclear fuel to the permanent repository; and (2) coordinate the transportation of high-level radioactive waste and spent nuclear fuel from sources other than utilities for which priorities are established under this Act with transportation from such utilities, with the goal of minimizing the number of shipments by combining them whenever possible.

Cosponsors

Members who signed on, in the order they did.

No cosponsors are on file for this measure.

Committees 1

Where it was sent and what each committee and subcommittee did with it, in order.

ChamberCommitteeWhat it did
HouseEnergy and Commerce Committee
Referred Oct 10, 2002
Energy Subcommittee
Referred Oct 28, 2002

Actions 3

Everything that happened, newest first.

  1. Oct 28, 2002Referred to the Subcommittee on Energy and Air Quality.
  2. Oct 10, 2002Introduced in House
  3. Oct 10, 2002Referred to the House Committee on Energy and Commerce.

Titles 1

Every title it has carried, official and short, at each stage.

Official Title as Introduced
To provide for prioritization of transportation of nuclear waste from utilities to a permanent repository on the basis of renewable energy use.

Subjects

Assigned by the Library of Congress. Policy area: Energy.

Text 1

Each version as it was printed, newest first.

  1. Oct 10, 2002Introduced in House

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details.

Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.