S 4111 · 109th Congress 2005–2007, ended

Louisiana Water Resources Projects Act of 2006

Fact sheet

Latest action · Dec 8, 2006 Read twice and referred to the Committee on Environment and Public Works.

Progress

Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.

  1. IntroducedDec 8, 2006
  2. Passed SenateNot reached
  3. Passed HouseNot reached
  4. To the PresidentNot reached
  5. Became lawNot reached

Summary

Louisiana Water Resources Projects Act of 2006 - Authorizes the Secretary of the Army to carry out: (1) the Bayou Sorrel Lock and, conditional on a favorable report, the Port of Iberia, Louisiana, navigation projects; (2) the Morganza to the Gulf of Mexico, Louisiana, hurricane and storm damage reduction project; and (3) a program for ecosystem restoration, Louisiana Coastal Area, including modifications needed to five critical ecosystem restoration features due to the impact of Hurricanes Katrina and Rita.

Establishes: (1) the Coastal Louisiana Ecosystem Protection and Restoration Task Force; and (2) a Louisiana Water Resources Council within the Mississippi River Commission.

Directs the Secretary to: (1) develop a plan for protecting, preserving, and restoring the coastal Louisiana ecosystem; (2) establish a coastal Louisiana ecosystem science and technology program; (3) study, design, and construct a type A regional visitors center in the vicinity of Morgan City, Louisiana; and (4) conduct a study to determine the feasibility of carrying out a project for navigation improvement at Vidalia, Louisiana.

Authorizes appropriations to: (1) support the relocation of Port of New Orleans deep draft facilities; and (2) the Assistant Secretary to provide relocation assistance to private businesses.

Modifies a flood control project for the Ouachita River and tributaries and directs that the Ouachita River Levees remain a component of the Mississippi River and Tributaries Project.

Modifies: (1) the public access feature of the Atchafalaya Basin Floodway System, Louisiana project; and (2) projects at Red River Waterway, the Calcasieu River and Pass, and East Baton Rouge Parish, Louisiana.

Cosponsors

Members who signed on, in the order they did.

No cosponsors are on file for this measure.

Actions 2

Everything that happened, newest first.

  1. Dec 8, 2006Introduced in Senate
  2. Dec 8, 2006Read twice and referred to the Committee on Environment and Public Works.

Subjects

Assigned by the Library of Congress. Policy area: Water Resources Development.

Text 1

Each version as it was printed, newest first.

  1. Dec 8, 2006Introduced in Senate

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details.

Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov.