Oregon · Senate Bill 330 · 2025 Regular Session
Directs the Public Utility Commission to adopt standards requiring the underground placement of electric power lines.
- Introduced Jan 13, 2025
- In committee Jan 17, 2025
- Died
- Passed the House
- To the governor
- Became law
What it does
The legislature's own summary of the bill, or its official long title.
Directs the PUC to adopt standards to require that power lines be placed underground. Provides for exceptions. (Flesch Readability Score: 63.8). Directs the Public Utility Commission to adopt standards requiring the underground placement of electric power lines. Provides for exceptions.
Every action
3 steps, oldest first, as the legislature records them.
- SenateIntroduction and first reading. Referred to President's desk.
- CommitteeReferred to Energy and Environment, then Ways and Means. · Senate Energy and Environment
- SenateIn committee upon adjournment.
Roll calls
No recorded votes on this bill yet.
Sponsors
The member who introduced it, joined by 1 cosponsor: 1 Democrat.
-
Jeff GoldenD Primary sponsor · District 3
All 1 cosponsor
From Oregon's official records (api.oregonlegislature.gov), checked Nov 13, 2026. Text links go to the official versions; LegiList does not copy bill text.