The legislature's own summary of the bill, or its official long title.
This Act makes power companies file plans with the PUC to use grid enhancing tech. Simplifies the local review of the tech. (Flesch Readability Score: 65.2). [ Digest: Makes a power company file with the PUC a plan for using grid enhancing technologies where doing so is cost-effective. Requires the plan to be updated every two years. (Flesch Readability Score: 61.8). ] Declares a state policy regarding the electric…
Read the full title (210 words)
This Act makes power companies file plans with the PUC to use grid enhancing tech. Simplifies the local review of the tech. (Flesch Readability Score: 65.2). [ Digest: Makes a power company file with the PUC a plan for using grid enhancing technologies where doing so is cost-effective. Requires the plan to be updated every two years. (Flesch Readability Score: 61.8). ] Declares a state policy regarding the electric transmission system. Requires an electric company to file with the Public Utility Commission a strategic plan for using grid enhancing technologies where doing so is cost-effective. Requires the plan to be updated [ every two years ] with the integrated resource plan . Requires an electric [ company to carry out the electric ] company's first filed strategic plan to identify which actions can be carried out not later than January 1, 2030. Requires an electric company to conduct a cost-effectiveness and timetable analysis of multiple strategies when proposing additions, improvements or modifications to a transmission system. Requires local governments to review certain applications for the use of grid enhancing technology in an existing right-of-way or easement without holding a hearing and through the application of only clear and objective criteria. Takes effect on the 91st day following adjournment sine die.
Every action
30 steps, oldest first, as the legislature records them.
Show the 22 earlier steps
HouseFirst reading. Referred to Speaker's desk.
CommitteeReferred to Climate, Energy, and Environment. · House Climate, Energy, and Environment
CommitteePublic Hearing held. · House Climate, Energy, and Environment
CommitteeWork Session held. · House Climate, Energy, and Environment
CommitteeRecommendation: Do pass. · House Climate, Energy, and Environment
HouseSecond reading.
HouseRules suspended. Carried over to April 9, 2025 Calendar.
HouseRules suspended. Carried over to April 10, 2025 Calendar.
HouseThird reading. Carried by Gamba. Passed.41–13 vote
SenateFirst reading. Referred to President's desk.
CommitteeReferred to Energy and Environment. · Senate Energy and Environment
CommitteePublic Hearing held. · Senate Energy and Environment
SenatePossible Work Session cancelled.
CommitteeWork Session held. · Senate Energy and Environment
CommitteeRecommendation: Do pass with amendments. (Printed A-Eng.) · Senate Energy and Environment
SenateSecond reading.
SenateCarried over to 06-03 by unanimous consent.
SenateCarried over to 06-04 by unanimous consent.
SenateCarried over to 06-05 by unanimous consent.
SenateCarried over to 06-09 by unanimous consent.
SenateCarried over to 06-10 by unanimous consent.
SenateCarried over to 06-11 by unanimous consent.
SenateCarried over to 06-12 by unanimous consent.
SenateThird reading. Carried by Golden. Passed.23–4 vote
HouseHouse concurred in Senate amendments and repassed bill.41–12 vote
HouseVote explanation(s) filed by Walters.
HouseSpeaker signed.
SenatePresident signed.
GovernorGovernor signed.
HouseChapter 391, (2025 Laws): Effective date September 26, 2025.
Roll calls
5 recorded votes: 3 on the floor, 2 in committee. Each shows how every member voted.
Third reading. Carried by Gamba. Passed. · Full House
From Oregon's official records (api.oregonlegislature.gov), checked Nov 13, 2026.
Text links go to the official versions; LegiList does not copy bill text.