ROCKWELL COLLINS, INC for ROCKWELL COLLINS, INC
What was lobbied
6 issue areas, each in the filer's own words, with who lobbied on it and where.
Banking BAN
--Lobbied for modification of EXIM quorum requirement.
| Lobbyist | Covered position, as disclosed |
|---|---|
| MEGAN RAE ROSIA | — |
Taxation/Internal Revenue Code TAX
--Lobbied in support of maintaining a 20% increasing permanent R&D tax credit in tax reform and increasing the "ASC" to 20%. --Lobbied for modification of Ex Im quorum requirement.
| Lobbyist | Covered position, as disclosed |
|---|---|
| TIMOTHY A PETERSON | — |
| MEGAN RAE ROSIA | — |
| ROBERT A STURGELL | — |
Communications/Broadcasting/Radio/TV COM
--Lobbied for consideration of aerospace and defense industry requirements in future spectrum legislation; lobbied to encourage FCC and NTIA to expedite allocation of spectrum for UAS command and control.
| Lobbyist | Covered position, as disclosed |
|---|---|
| TIMOTHY A PETERSON | — |
| MEGAN RAE ROSIA | — |
Defense DEF
--Lobbied to strengthen commercial item procurement for DoD acquisition policy in the FY 18 National Defense Authorization Act (NDAA) to include: clarifying the definition of a commercial item, market research, value analysis, limit the flow down of government clauses to commercial contracts. --Lobbied for language and full funding in the FY 17 Defense Appropriations (H.R. 5293 and S. 3000) bills for: (1) Handheld Manpack Small Form Fit (HMS) acquisition strategy for continued LRIP extension and FRP; (2) The Air Force's F-35 to include funding for the Helmet Mounted Display System (HMDS); (3) The Navy's Tactical Combat Training System (TCTSII) to use a Common Range Integrated Instruction System (CRIIS) as a solution; (4) The Navy's CH-53K program; (5) The Army's UH-60M program; (6) Increase funding for the Defense Production Act Title III; (7) The Army's UH-60M procurement accounts to increase funding and authorization for the UH-60M for the Active Army and ARNG; (8) The Air Force's B-21 funding (specifically, its acquisition contract type.)
| Lobbyist | Covered position, as disclosed |
|---|---|
| TIMOTHY A PETERSON | — |
| ROBERT A STURGELL | — |
Aerospace AER
--Lobbied for FAA reauthorization to include: (1) streamlining of FAA's certification activities and effective use of ODA program; (2) expansion of FAA's current UAS roadmap reporting requirements with annual publication and opportunity for review and comment by stakeholders; (3) support design, certification and operations standards for complete integration of commercial UAS into the NAS; (4) appropriate policies to maximize commercial UAS market growth; (5) accelerated UAS rulemakings on security issues (remote identification, operations over fixed sites, and operations near airports), operations over people, and beyond visual line of sight; (6) assurance all organizations within FAA are coordinating effectively on accelerating full UAS integration (AVS, ATO, NextGen, Airports, Spectrum and Policy Offices.) (7) full utilization of test sites; and (8) federal preemption of certain state and local laws governing UAS.(P.L. 114-190)
| Lobbyist | Covered position, as disclosed |
|---|---|
| MEGAN RAE ROSIA | — |
| ROBERT A STURGELL | — |
Budget/Appropriations BUD
A)--Maintain Department of Defense Appropriations (base budget and OCO) at or above the FY 18 President budget request, as well as, funding in DoD's procurement accounts for: (1) The Air Force's F-35 appropriations to include funding for the Helmet Mounted Display System (HMDS). (2) The Navy's Tactical Combat Training System (TCTSII). (3) The Navy's CH-53K appropriations. (4) Increased appropriations for the Defense Production Act Title III program line. (5) The Army's procurement accounts to increase funding for the UH-60M for the active Army and the ARNG. (6) The Army's procurement accounts to increase funding for the CH-47F. B)--Lobbied for FY 17 full-year appropriations to include adequate funding for: (1) all FAA certification and safety activities, including certification reform; (2) continued transition to NextGen and investment in core ATC programs; and (3) UAS research, work with industry through the DAC, ARCs and other avenues, development of design, certification and operational standards for UAS integration into NAS including integrated airspace, and increasing UAS rulemaking and certification activities to accelerate UAS integration.
| Lobbyist | Covered position, as disclosed |
|---|---|
| TIMOTHY A PETERSON | — |
| MEGAN RAE ROSIA | — |
| ROBERT A STURGELL | — |
Shown as published by the Senate Office of Public Records and the House Clerk under the Lobbying Disclosure Act. The official filing is the record; open it for the full form.