High-Capacity Grid Act
Latest action · Sep 16, 2026 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Progress
Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.
- IntroducedDec 11, 2025
- Passed HouseSep 15, 2026
- Passed SenateNot reached
- To the PresidentNot reached
- Became lawNot reached
Summary
High-Capacity Grid Act
This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.
Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.
A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.
The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.
Cosponsors 4
Members who signed on, in the order they did. Signatures ran from Dec 17, 2025 to Jun 30, 2026.
| Seat | Cosponsor | Signed on | |
|---|---|---|---|
| R-AZ | Abraham J. Hamadeh | Dec 17, 2025 | |
| R-TX | Dan Crenshaw | Jan 9, 2026 | |
| R-IN | Jefferson Shreve | Jan 20, 2026 | |
| R-VA | Robert J. Wittman | Jun 30, 2026 |
Committees 2
Where it was sent and what each committee and subcommittee did with it, in order.
| Chamber | Committee | What it did |
|---|---|---|
| House | Energy and Commerce Committee | Referred Dec 11, 2025Markup Jul 20, 2026Markup Jul 21, 2026Reported Sep 14, 2026 |
| Energy Subcommittee | Referred Dec 11, 2025Markup Jun 24, 2026Reported Jun 24, 2026 | |
| Senate | Energy and Natural Resources Committee | Referred Sep 16, 2026 |
Actions 16
Everything that happened, newest first.
- Sep 16, 2026Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
- Sep 15, 2026Considered under suspension of the rules. (consideration: CR H5662-5663)
- Sep 15, 2026Mr. Guthrie moved to suspend the rules and pass the bill, as amended.
- Sep 15, 2026DEBATE - The House proceeded with forty minutes of debate on H.R. 6633.
- Sep 15, 2026Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H5662)
In the Congressional Record 1
Days the Record’s own index lists this bill, newest first, with the pages and the members it names. Pages starting H are the House, S the Senate, E Extensions of Remarks.
| Where | In the Record | Members | Date |
|---|---|---|---|
| House | Debate and remarks H5662, H5663Text printed H5662 | Brett Guthrie R-KY, Julie Fedorchak R-ND, Lizzie Fletcher D-TX | Sep 15, 2026 |
Research
What has been written about this bill: committee reports, cost estimates, the sponsor’s authority statement, printed hearings and the Congressional Research Service’s work.
Committee report
Congressional Budget Office cost estimate
- Sep 2, 2026H.R. 6633, High-Capacity Grid ActAs ordered reported by the House Committee on Energy and Commerce on July 21, 2026
Constitutional authority
The sponsor’s statement, as printed in the Congressional Record, vol. 171, no. 209, December 11, 2025, page H5810.
Titles 6
Every title it has carried, official and short, at each stage.
- Official Title as Introduced
- To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
- Short Title(s) as Introduced
- High-Capacity Grid Act
- Short Title(s) as Reported to House
- High-Capacity Grid Act
- Short Title(s) as Passed House
- High-Capacity Grid Act
- Short Titles from RFS (Referred to Senate) bill text
- High-Capacity Grid Act
- Official Title from EH (Engrossed in House) bill text
- To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
Subjects
Assigned by the Library of Congress. Policy area: Energy.
Text 4
Each version as it was printed, newest first.
- Sep 16, 2026Referred in Senate
- Sep 15, 2026Engrossed in House
- Sep 14, 2026Reported in House
- Dec 11, 2025Introduced in House
Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.