To clarify that, with respect to each Missouri River mainstem reservoir of the Corps of Engineers located in a State, the State maintains authority to allocate and appropriate the quantity of water in the reservoir that is attributable to the natural flows of the Missouri River within the boundaries of the State, and for other purposes.
Latest action · Jul 19, 2013 Referred to the Subcommittee on Water Resources and Environment.
Progress
Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.
- IntroducedJul 18, 2013
- Passed HouseNot reached
- Passed SenateNot reached
- To the PresidentNot reached
- Became lawNot reached
Summary
Declares it to be congressional policy that: (1) a state has authority to manage the waters of rivers located within its boundaries; and (2) a state in which a Missouri River mainstem reservoir of the Corps of Engineers is located maintains authority to allocate the quantity of water in the reservoir attributable to the natural flows of the Missouri River within its boundaries. Requires all policies and procedures for the operations of Missouri River mainstem reservoirs of the Corps to be consistent with such policy.
Defines "natural flows" to mean Missouri River waters that would be flowing in a state in the absence of a dam that forms a Missouri River mainstem reservoir of the Corps. Requires the quantity of natural flows to be determined based on average monthly flows (excluding depletions) and to be calculated for the entire period of record, including before, during, and after construction of any dams or reservoirs.
Requires the Secretary of the Army to determine the quantity of water in each Missouri River mainstem reservoir of the Corps that is attributable to the natural flows of the Missouri River within the state in which the reservoir is located. Authorizes a state to seek judicial review of such determination.
Prohibits the Secretary from charging a fee in connection with water of the Missouri River in a state, without the state's consent, until such quantity of the natural flows of the Missouri River within the state is determined.
Cosponsors 2
Members who signed on, in the order they did. Signatures ran from Jul 18, 2013 to Apr 9, 2014; 1 is an original cosponsor, there from the day it was introduced.
| Seat | Cosponsor | Signed on | |
|---|---|---|---|
| R-ND | Kevin Cramer | Original | Jul 18, 2013 |
| R-NE | Adrian Smith | Apr 9, 2014 |
Committees 1
Where it was sent and what each committee and subcommittee did with it, in order.
| Chamber | Committee | What it did |
|---|---|---|
| House | Transportation and Infrastructure Committee | Referred Jul 18, 2013 |
| Water Resources and Environment Subcommittee | Referred Jul 19, 2013 |
Actions 3
Everything that happened, newest first.
- Jul 19, 2013Referred to the Subcommittee on Water Resources and Environment.
- Jul 18, 2013Introduced in House
- Jul 18, 2013Referred to the House Committee on Transportation and Infrastructure.
Research
What has been written about this bill: committee reports, cost estimates, the sponsor’s authority statement, printed hearings and the Congressional Research Service’s work.
Constitutional authority
The sponsor’s statement, as printed in the page H4726.
Titles 1
Every title it has carried, official and short, at each stage.
- Official Title as Introduced
- To clarify that, with respect to each Missouri River mainstem reservoir of the Corps of Engineers located in a State, the State maintains authority to allocate and appropriate the quantity of water in the reservoir that is attributable to the natural flows of the Missouri River within the boundaries of the State, and for other purposes.
Subjects
Assigned by the Library of Congress. Policy area: Water Resources Development.
Text 1
Each version as it was printed, newest first.
- Jul 18, 2013Introduced in House
Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.