Requires new data centers to incorporate thermal energy networks
- Introduced Oct 17, 2025
- In committee Oct 17, 2025
- Passed the Assembly Next
- Passed the Senate
- To the governor
- Became law
What it does
The legislature's own summary of the bill, or its official long title.
Requires the owner or operator of a new data center to submit to the Public Service Commission a thermal energy network feasibility assessment that identifies potential off-site thermal loads within one mile of the facility; requires that new data centers be designed, constructed, and operated to capture and reuse waste heat generated by computing equipment through a thermal energy network.
Every action
2 steps, oldest first, as the legislature records them.
- CommitteeREFERRED TO ENERGY · Assembly Energy
- CommitteeREFERRED TO ENERGY · Assembly Energy
Roll calls
No recorded votes on this bill yet.
Sponsors
The member who introduced it.
-
Michaelle C. SolagesD Primary sponsor · District 22