Nevada · Assembly Bill 90 · 82nd (2023) Session

Revises provisions relating to water. (BDR 48-717)

  1. Introduced Jan 30, 2023
  2. In committee Jan 30, 2023
  3. Died  
  4. Passed the Senate  
  5. To the governor  
  6. Became law  

What it does

The legislature's own summary of the bill, or its official long title.

Under existing law, the State Engineer may grant a permit for a temporary change of the place of diversion, manner of use or place of use of water already appropriated for a period not to exceed 1 year. Before granting such a permit, if the State Engineer determines that a temporary change may not be in the public interest, or may impair the water rights held by other persons, existing law: (1) requires the State…

Read the full title (346 words)

Under existing law, the State Engineer may grant a permit for a temporary change of the place of diversion, manner of use or place of use of water already appropriated for a period not to exceed 1 year. Before granting such a permit, if the State Engineer determines that a temporary change may not be in the public interest, or may impair the water rights held by other persons, existing law: (1) requires the State Engineer to give notice of the application; (2) authorizes any interested person to file a written protest to the application; and (3) if a protest is filed, provides that the State Engineer may hold a hearing. (NRS 533.345) Section 1 of this bill authorizes the State Engineer to grant an application for a temporary change for a period not to exceed 10 years. If an application for a temporary change is filed for a period of more than 1 year, section 1 requires the State Engineer to give notice of the application. Existing law sets forth a schedule of fees that the State Engineer is required to collect for providing various services relating to the appropriation of water, including fees for: (1) examining and filing an application for a temporary permit to change the point of diversion, manner of use or place of use of an existing water right; and (2) with certain exceptions, issuing and recording each permit to change an existing water right, whether temporary or permanent. (NRS 533.435) Section 2 of this bill instead establishes fees for: (1) examining and filing an application for a temporary permit to change an existing water right for a period of 1 year or less; (2) examining and filing an application for a temporary permit to change an existing water right for a period of more than 1 year; (3) with certain exceptions, issuing and recording each permit for a permanent change to an existing water right for any purpose; and (4) with certain exceptions, issuing and recording each permit for a temporary change to an existing water right for any purpose.

Every action

7 steps, oldest first, as the legislature records them.

  1. AssemblyPrefiled.
  2. CommitteeReferred to Committee on Natural Resources. · Assembly Natural Resources
  3. AssemblyTo printer.
  4. AssemblyFrom printer.
  5. AssemblyRead first time.
  6. AssemblyTo committee.
  7. Assembly(Pursuant to Joint Standing Rule No. 14.3.1, no further action allowed.)

Roll calls

No recorded votes on this bill yet.

Sponsors

The member who introduced it.

From Nevada's official records (leg.state.nv.us), checked Nov 13, 2026. Text links go to the official versions; LegiList does not copy bill text.