Nevada · Assembly Bill 524 · 82nd (2023) Session

Revises certain provisions governing electric utilities. (BDR 58-985)

  1. Introduced May 26, 2023
  2. In committee May 26, 2023
  3. Passed the Assembly Jun 3, 2023
  4. Passed the Senate Jun 5, 2023
  5. To the governor Jun 9, 2023
  6. Became law Jun 15, 2023

What it does

The legislature's own summary of the bill, or its official long title.

Existing law requires each electric utility to submit to the Public Utilities Commission of Nevada every 3 years an integrated resource plan to increase the utility's supply of electricity or decrease the demands made on its system by its customers. Existing law provides that the integrated resource plan must include certain components, including, without limitation, a comparison of a diverse set of scenarios of the…

Read the full title (430 words)

Existing law requires each electric utility to submit to the Public Utilities Commission of Nevada every 3 years an integrated resource plan to increase the utility's supply of electricity or decrease the demands made on its system by its customers. Existing law provides that the integrated resource plan must include certain components, including, without limitation, a comparison of a diverse set of scenarios of the best combination of sources of supply to meet the demands or the best methods to reduce the demands. (NRS 704.741) Section 2 of this bill sets forth certain declarations of the Legislature relating to the affordability, availability and reliability of the supply of electricity in this State. Section 4 of this bill requires the integrated resource plan of an electric utility to include: (1) at least one scenario that provides for the construction or acquisition of energy resources through contract or ownership to be placed into service to close an open position utilizing dedicated energy resources in this State and dedicated energy resources delivered through firm transmission; and (2) for each scenario considered, certain information regarding each energy resource proposed and an evaluation of the impact the implementation of a scenario will have on certain matters. Section 4 authorizes an electric utility to submit an integrated resource plan more frequently than once every 3 years. Section 4 requires the Commission to adopt regulations governing the manner in which and circumstances under which an electric utility may file an amendment to its integrated resource plan. Section 5 of this bill requires an electric utility to schedule a consumer session before filing an integrated resource plan or an amendment to such a plan. Sections 6 and 7 of this bill make a conforming change to reflect changes in the numbering of subsections in section 4. Section 1 of this bill revises the definition of “facility for the storage of energy from renewable generation.” Existing law requires certain electric utilities to file a general rate application once every 36 months. Existing law prohibits a public utility that has filed a general rate application from filing another general rate application until all pending general rate applications filed by that utility have been decided by the Commission, except under certain circumstances. (NRS 704.110) Section 3 of this bill authorizes an electric utility to file a general rate application more frequently than once every 36 months. Section 3 provides that an affiliate of a public utility is also prohibited from filing another general rate application until all pending general rate applications filed by that utility have been decided by the Commission.

Every action

47 steps, oldest first, as the legislature records them.

Show the 39 earlier steps
  1. AssemblyWaiver granted effective: March 16, 2023.
  2. AssemblyRead first time.
  3. CommitteeReferred to Committee on Growth and Infrastructure. · Assembly Growth and Infrastructure
  4. AssemblyTo printer.
  5. AssemblyFrom printer.
  6. AssemblyTo committee.
  7. CommitteeFrom committee: Amend, and do pass as amended. · Assembly Growth and Infrastructure
  8. AssemblyPlaced on Second Reading File.
  9. AssemblyRead second time.
  10. AssemblyAmended. (Amend. No. 907.)
  11. AssemblyTo printer.
  12. AssemblyFrom printer.
  13. AssemblyTo engrossment.
  14. AssemblyEngrossed.
  15. AssemblyFirst reprint.
  16. AssemblyTaken from General File.
  17. AssemblyPlaced on Chief Clerk's desk.
  18. AssemblyTaken from Chief Clerk's desk.
  19. AssemblyPlaced on General File.
  20. AssemblyRead third time.
  21. AssemblyAmended. (Amend. No. 943.)
  22. AssemblyDispensed with reprinting.
  23. AssemblyRead third time.
  24. AssemblyPassed, as amended. Title approved. (Yeas: 42, Nays: None.)
  25. AssemblyTo printer.
  26. AssemblyFrom printer.
  27. AssemblyTo reengrossment.
  28. AssemblyReengrossed.
  29. AssemblySecond reprint.
  30. AssemblyTo Senate.
  31. SenateIn Senate.
  32. SenateRead first time.
  33. CommitteeReferred to Committee on Finance. · Senate Finance
  34. SenateAction of referral rescinded.
  35. CommitteeReferred to Committee on Growth and Infrastructure. · Senate Growth and Infrastructure
  36. SenateTo committee.
  37. CommitteeFrom committee: Do pass. · Senate Growth and Infrastructure
  38. SenatePlaced on Second Reading File.
  39. SenateRead second time.
  1. SenateRead third time.
  2. SenatePassed. Title approved. (Yeas: 20, Nays: 1.)
  3. SenateTo Assembly.
  4. AssemblyIn Assembly.
  5. AssemblyTo enrollment.
  6. AssemblyEnrolled and delivered to Governor.
  7. GovernorApproved by the Governor.
  8. Secretary of StateChapter 495.

Roll calls

2 recorded votes: 2 on the floor, 0 in committee. Each shows how every member voted.

Sponsors

The member who introduced it.

From Nevada's official records (leg.state.nv.us), checked Nov 13, 2026. Text links go to the official versions; LegiList does not copy bill text.