Appropriation; MDOT to hire consultant for study on most efficient design of a certain corridor along MS Hwy 305 in DeSoto County.
- Introduced Jan 12, 2026
- In committee Jan 12, 2026
- Died
- Passed the Senate
- To the governor
- Became law
What it does
The legislature's own summary of the bill, or its official long title.
AN ACT MAKING AN APPROPRIATION TO THE MISSISSIPPI DEPARTMENT OF TRANSPORTATION FOR THE PURPOSE OF HIRING A CONSULTANT TO CONDUCT A FEASIBILITY STUDY TO DETERMINE THE MOST EFFICIENT DESIGN OF THE CORRIDOR ALONG MISSISSIPPI HIGHWAY 305 IN DESOTO COUNTY FROM CHURCH STREET TO THE LEWISBURG COMMUNITY FOR THE FISCAL YEAR 2027.
Every action
2 steps, oldest first, as the legislature records them.
- CommitteeReferred To Appropriations E;Appropriations A · House Appropriations E
- HouseDied In Committee
Roll calls
No recorded votes on this bill yet.
Sponsors
The member who introduced it, joined by 1 cosponsor: 1 Republican.
-
Kimberly RemakR Primary sponsor · District 7
All 1 cosponsor
Support LegiList
This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.
From Mississippi's official records (billstatus.ls.state.ms.us), checked Nov 18, 2026. Text links go to the official versions; LegiList does not copy bill text.