CLOSED-LOOP WELL SETBACKS
- Introduced Feb 5, 2024
- In committee Feb 6, 2024
- Died
- Passed the Senate
- To the governor
- Became law
What it does
The legislature's own summary of the bill, or its official long title.
Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.
Every action
7 steps, oldest first, as the legislature records them.
- HouseFiled with the Clerk by Rep. Dave Vella
- HouseFirst Reading
- CommitteeReferred to Rules Committee · House Rules
- CommitteeAssigned to Energy & Environment Committee · House Energy & Environment
- HouseAdded Co-Sponsor Rep. Joyce Mason
- CommitteeRule 19(a) / Re-referred to Rules Committee · House Rules
- HouseSession Sine Die
Roll calls
No recorded votes on this bill yet.
Sponsors
The member who introduced it, joined by 1 cosponsor: 1 Democrat.
-
Dave VellaD Primary sponsor · District 68
All 1 cosponsor
From Illinois's official records (www.ilga.gov), checked Nov 2, 2026. Text links go to the official versions; LegiList does not copy bill text.