The legislature's own summary of the bill, or its official long title.
Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process. Expands reporting requirements of the Hawaii Electricity Reliability Administrator to include reporting on the grid-ready home interconnection process. Effective 7/1/3000. (HD1)
Every action
7 steps, oldest first, as the legislature records them.
HousePending introduction.
HouseIntroduced and Pass First Reading.
CommitteeReferred to EEP, CPC, referral sheet 5 · House Energy & Environmental Protection
CommitteeBill scheduled to be heard by EEP on Thursday, 02-12-26 9:45AM in House conference room 325 VIA VIDEOCONFERENCE. · House Energy & Environmental Protection
CommitteeThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 7 Ayes: Representative(s) Lowen, Perruso, Chun, Kahaloa, Kusch, Quinlan, Matsumoto; Ayes with reservations: none; Noes: none; and Excused: none. · House Energy & Environmental Protection
CommitteeReported from EEP (Stand. Com. Rep. No. 390-26) as amended in HD 1, recommending passage on Second Reading and referral to CPC. · House Energy & Environmental Protection
CommitteePassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; none voting no (0) and none excused (0). · House Consumer Protection & Commerce50–0 vote
Roll calls
2 recorded votes: 1 on the floor, 1 in committee. Each shows how every member voted.
Passed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; none voting no (0) and none excused (0). · Full House