AN ACT REQUIRING A STUDY OF THE FEASIBILITY OF REDUCING THE TIME TO SWITCH ELECTRIC SUPPLIERS.
- Introduced Feb 18, 2026
- In committee Feb 19, 2026
- Died
- Passed the House
- To the governor
- Became law
What it does
The legislature's own summary of the bill, or its official long title.
To require the Consumer Counsel to conduct a study of the feasibility of reducing the time it takes a consumer to switch electric suppliers.
Every action
2 steps, oldest first, as the legislature records them.
- CommitteeReferred to Joint Committee on Energy and Technology · Joint Energy and Technology Committee
- Public Hearing 02/24
Roll calls
No recorded votes on this bill yet.
Sponsors
The 0 members who introduced it, joined by 1 cosponsor: 1 Republican.
- Ea Energy and Technology Committee Sponsoring committee
All 1 cosponsor
Support LegiList
This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.
From Connecticut's official records (www.cga.ct.gov), checked Nov 18, 2026. Text links go to the official versions; LegiList does not copy bill text.