California · Senate Bill 256 · 2025-2026 Regular Session

Electricity: electrical infrastructure: wildfire mitigation.

  1. Introduced Feb 3, 2025
  2. In committee Feb 14, 2025
  3. Passed the Senate Jun 3, 2025
  4. Passed the Assembly Next
  5. To the governor  
  6. Became law  

What it does

The legislature's own summary of the bill, or its official long title.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and…

Read the full title (780 words)

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire, as specified. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires local publicly owned electric utilities and electrical cooperatives to annually prepare wildfire mitigation plans and submit the plans to the California Wildfire Safety Advisory Board, as specified. Existing law requires that each wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, and a description of the appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, as provided. This bill would require the commission, on or before January 1, 2027, to update a general order to require each electrical corporation to remove all permanently abandoned facilities, as specified. The bill would require an electrical corporation, for areas affected by wildfire that require electrical distribution infrastructure to be rebuilt, to consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies. This bill would require an electrical corporation, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require an electrical corporation, for the description in the wildfire mitigation plan of the electrical corporation’s appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, to include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and of communications with public safety partners, as provided. The bill would require that an electrical corporation’s wildfire mitigation plan also include a description of the processes and procedures that the electrical corporation use to coordinate communications with local governments within the service area of the electric corporation, and include an accounting of all transmission facilities, including permanently abandoned facilities, and include a plan for how and when each permanently abandoned facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, as provided. This bill would require local publicly owned electric utilities and electrical cooperatives, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require a local publicly owned electric utility or electrical cooperative’s wildfire mitigation plan to include a description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, as specified. Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. This bill would require certain electrical corporations and local publicly owned electric utilities, in cooperation with OES and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign liaison representatives to work within each local operations center, as provided. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing certain of this bill’s requirements would be a crime, the bill would impose a state-mandated local program. Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Every action

24 steps, oldest first, as the legislature records them.

Show the 16 earlier steps
  1. SenateIntroduced. Read first time. To Com. on RLS. for assignment. To print.
  2. SenateFrom printer. May be acted upon on or after March 6.
  3. CommitteeReferred to Com. on RLS. · Senate Rules
  4. CommitteeFrom committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. · Senate Rules
  5. CommitteeRe-referred to Com. on E., U & C. · Senate Energy, Utilities and Communications
  6. CommitteeSet for hearing April 29. · Senate Energy, Utilities and Communications
  7. CommitteeFrom committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 2. Page 934.) (April 29). · Senate Energy, Utilities and Communications
  8. CommitteeRead second time and amended. Re-referred to Com. on APPR. · Senate Appropriations
  9. CommitteeSet for hearing May 19. · Senate Appropriations
  10. CommitteeMay 19 hearing: Placed on APPR. suspense file. · Senate Appropriations
  11. CommitteeSet for hearing May 23. · Senate Appropriations
  12. CommitteeFrom committee: Do pass. (Ayes 5. Noes 1. Page 1193.) (May 23). · Senate Appropriations
  13. SenateRead second time. Ordered to third reading.
  14. SenateRead third time. Passed. (Ayes 30. Noes 8. Page 1474.) Ordered to the Assembly.
  15. AssemblyIn Assembly. Read first time. Held at Desk.
  16. CommitteeReferred to Coms. on U. & E. and E.M. · Assembly Utilities and Energy
  1. CommitteeFrom committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. · Assembly Utilities and Energy
  2. CommitteeJune 25 set for first hearing canceled at the request of author. · Assembly Utilities and Energy
  3. CommitteeFrom committee: Do pass and re-refer to Com. on E.M. (Ayes 13. Noes 4.) (July 9). Re-referred to Com. on E.M. · Assembly Utilities and Energy
  4. CommitteeFrom committee with author's amendments. Read second time and amended. Re-referred to Com. on E.M. · Assembly Emergency Management
  5. CommitteeFrom committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 2.) (July 14). · Assembly Emergency Management
  6. CommitteeRead second time and amended. Re-referred to Com. on APPR. · Assembly Appropriations
  7. CommitteeAugust 20 set for first hearing. Placed on APPR. suspense file. · Assembly Appropriations
  8. CommitteeAugust 29 hearing: Held in committee and under submission. · Assembly Appropriations

Roll calls

6 recorded votes: 1 on the floor, 5 in committee. Each shows how every member voted.

Committee and other votes

DateWhereQuestionResult
Apr 29, 2025 Senate Energy, Utilities and Communications Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations]
Members

Yes · 14

No · 2

Not voting · 1

Passed 14–2
May 19, 2025 Senate Appropriations Placed on suspense file
Members

Yes · 5

Not voting · 2

Passed 5–0
May 23, 2025 Senate Appropriations Do pass
Members

Yes · 5

No · 1

Not voting · 1

Passed 5–1
Jul 9, 2025 Assembly Utilities and Energy Do pass and be re-referred to the Committee on [Emergency Management]
Members

Yes · 13

No · 4

Not voting · 1

Passed 13–4
Jul 14, 2025 Assembly Emergency Management Do pass as amended and be re-referred to the Committee on [Appropriations]
Members

Yes · 5

No · 2

Passed 5–2

Sponsors

The member who introduced it, joined by 2 cosponsors: 2 Democrats.

All 2 cosponsors

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details. Other amounts

From California's official records (downloads.leginfo.legislature.ca.gov), checked Nov 18, 2026. Text links go to the official versions; LegiList does not copy bill text.