California · Assembly Bill 1408 · 2025-2026 Regular Session

Electricity: interconnections.

  1. Introduced Feb 21, 2025
  2. In committee Mar 13, 2025
  3. Passed the Assembly Jun 2, 2025
  4. Passed the Senate Sep 3, 2025
  5. To the governor Sep 15, 2025
  6. Vetoed Oct 3, 2025

What it does

The legislature's own summary of the bill, or its official long title.

Existing law establishes the Independent System Operator (ISO) as a nonprofit, public benefit corporation and requires the ISO, among other duties, to ensure the efficient use and reliable operation of the transmission grid consistent with the achievement of planning and operating reserve criteria, as provided. This bill would require the ISO to integrate surplus interconnection service considerations into its…

Read the full title (387 words)

Existing law establishes the Independent System Operator (ISO) as a nonprofit, public benefit corporation and requires the ISO, among other duties, to ensure the efficient use and reliable operation of the transmission grid consistent with the achievement of planning and operating reserve criteria, as provided. This bill would require the ISO to integrate surplus interconnection service considerations into its long-term transmission planning and enhance transparency around surplus interconnection service opportunities, as specified. Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires the commission to adopt a process for each load-serving entity to file an integrated resource plan, adopt a schedule for periodic updates to the plan, and ensure each load-serving entity take specified actions, as specified. Existing law also requires the governing board of each local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours to adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure the utility achieves certain goals, as specified. This bill would require each electrical corporation, and each local publicly owned utility with an annual electrical demand exceeding 700 gigawatthours, to require the evaluation of surplus interconnection service options and to consider surplus interconnection service options, for purposes of its integrated resource plan. This bill would also require each electrical corporation or local publicly owned electric utility to use available grid infrastructure through surplus interconnection service to use any available interconnection capacity, as specified. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because certain provisions of this bill would be part of the act and a violation of a commission action implementing the bill’s requirements would be a crime, the bill would impose a state-mandated local program. Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Every action

31 steps, oldest first, as the legislature records them.

Show the 23 earlier steps
  1. AssemblyIntroduced. To print.
  2. AssemblyFrom printer. May be heard in committee March 24.
  3. AssemblyRead first time.
  4. CommitteeReferred to Com. on U. & E. · Assembly Utilities and Energy
  5. CommitteeFrom committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. · Assembly Utilities and Energy
  6. CommitteeRe-referred to Com. on U. & E. · Assembly Utilities and Energy
  7. CommitteeIn committee: Set, first hearing. Hearing canceled at the request of author. · Assembly Utilities and Energy
  8. CommitteeFrom committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 30). · Assembly Utilities and Energy
  9. AssemblyRead second time and amended.
  10. CommitteeRe-referred to Com. on APPR. · Assembly Appropriations
  11. CommitteeIn committee: Set, first hearing. Referred to APPR. suspense file. · Assembly Appropriations
  12. CommitteeFrom committee: Do pass. (Ayes 14. Noes 0.) (May 23). · Assembly Appropriations
  13. AssemblyRead second time. Ordered to third reading.
  14. AssemblyRead third time. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 1891.)
  15. SenateIn Senate. Read first time. To Com. on RLS. for assignment.
  16. CommitteeReferred to Com. on E., U & C. · Senate Energy, Utilities and Communications
  17. CommitteeFrom committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U & C. · Senate Energy, Utilities and Communications
  18. CommitteeFrom committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 16. Noes 0.) (July 15). · Senate Energy, Utilities and Communications
  19. CommitteeRead second time and amended. Re-referred to Com. on APPR. · Senate Appropriations
  20. CommitteeIn committee: Hearing postponed by committee. · Senate Appropriations
  21. CommitteeFrom committee: Be ordered to second reading pursuant to Senate Rule 28.8. · Senate Appropriations
  22. SenateRead second time. Ordered to third reading.
  23. SenateRead third time and amended. Ordered to second reading.
  1. SenateRead second time. Ordered to third reading.
  2. SenateRead third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 2467.).
  3. AssemblyIn Assembly. Concurrence in Senate amendments pending.
  4. AssemblySenate amendments concurred in. To Engrossing and Enrolling. (Ayes 78. Noes 0. Page 2926.).
  5. GovernorEnrolled and presented to the Governor at 4:30 p.m.
  6. GovernorVetoed by Governor.
  7. AssemblyConsideration of Governor's veto pending.
  8. AssemblyConsideration of Governor's veto stricken from file.

Roll calls

6 recorded votes: 3 on the floor, 3 in committee. Each shows how every member voted.

AB 1408 Irwin Assembly Third Reading · Full Assembly

Passed 79–0
Jun 2, 2025 · journal entry
Yes 79 No 0
Democrats: 60 yes, 0 no Republicans: 19 yes, 0 no
How each member voted

Yes · 79

Assembly 3rd Reading AB1408 Irwin et al. By Padilla · Full Senate

Passed 40–0
Sep 3, 2025 · journal entry
Yes 40 No 0
Democrats: 30 yes, 0 no Republicans: 10 yes, 0 no
How each member voted

Yes · 40

AB 1408 Irwin Concurrence in Senate Amendments · Full Assembly

Passed 78–0
Sep 4, 2025 · journal entry
Yes 78 No 0 Not voting 1
Democrats: 59 yes, 0 no Republicans: 19 yes, 0 no
How each member voted

Yes · 78

Not voting · 1

Committee and other votes

DateWhereQuestionResult
Apr 30, 2025 Assembly Utilities and Energy Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar
Members

Yes · 18

Passed 18–0
May 23, 2025 Assembly Appropriations Do pass.
Members

Yes · 14

Not voting · 1

Passed 14–0
Jul 15, 2025 Senate Energy, Utilities and Communications Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations]
Members

Yes · 16

Not voting · 1

Passed 16–0

Sponsors

The member who introduced it, joined by 2 cosponsors: 2 Democrats.

All 2 cosponsors

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details. Other amounts

From California's official records (downloads.leginfo.legislature.ca.gov), checked Nov 18, 2026. Text links go to the official versions; LegiList does not copy bill text.