LARGE PUBLIC POWER COUNCIL for LARGE PUBLIC POWER COUNCIL
What was lobbied
3 issue areas, each in the filer's own words, with who lobbied on it and where.
Utilities UTI
Electric system reliability and resiliency, cyber and physical security of the electric grid, municipal bond financing, energy tax incentives, EPA regulation related to the Clean Air Act, permitting reform, and interconnection prioritization.
| Lobbyist | Covered position, as disclosed |
|---|---|
| THOMAS FALCONE | — |
Energy/Nuclear ENG
Electric system reliability and resiliency, cyber and physical security of the electric grid, municipal bond financing, energy tax incentives, EPA regulation related to the Clean Air Act, permitting reform, and interconnection prioritization.
| Lobbyist | Covered position, as disclosed |
|---|---|
| THOMAS FALCONE | — |
Clean Air and Water (quality) CAW
Electric system reliability and resiliency, cyber and physical security of the electric grid, municipal bond financing, energy tax incentives, EPA regulation related to the Clean Air Act, permitting reform, and interconnection prioritization.
| Lobbyist | Covered position, as disclosed |
|---|---|
| THOMAS FALCONE | — |
Shown as published by the Senate Office of Public Records and the House Clerk under the Lobbying Disclosure Act. The official filing is the record; open it for the full form.