Memorandum

Construction of American Pipelines

Federal Register citation
82 FR 8659
Document number
2017-02031
Issuing office
Executive Office of the President

The document

As published in the Federal Register, with the source's own line breaks.

Memorandum of January 24, 2017

Construction of American Pipelines

Memorandum for the Secretary of Commerce

The Secretary of Commerce, in consultation with all
relevant executive departments and agencies, shall
develop a plan under which all new pipelines, as well
as retrofitted, repaired, or expanded pipelines, inside
the borders of the United States, including portions of
pipelines, use materials and equipment produced in the
United States, to the maximum extent possible and to
the extent permitted by law. The Secretary shall submit
the plan to the President within 180 days of the date
of this memorandum.

``Produced in the United States'' shall mean:

(i) With regard to iron or steel products, that all manufacturing processes
for such iron or steel products, from the initial melting stage through the
application of coatings, occurred in the United States.

(ii) Steel or iron material or products manufactured abroad from semi-
finished steel or iron from the United States are not ``produced in the
United States'' for purposes of this memorandum.

(iii) Steel or iron material or products manufactured in the United States
from semi-finished steel or iron of foreign origin are not ``produced in
the United States'' for purposes of this memorandum.

The Secretary of Commerce is hereby authorized and
directed to publish this memorandum in the Federal
Register.

THE WHITE HOUSE,

Washington, January 24, 2017

Sources

Every figure and line above comes from these; they open at the publisher.

Record fr-2017-02031, held as published by the Federal Register. LegiList reproduces the text and does not edit it.