HR 875 · 115th Congress 2017–2019, ended

Bureau of Reclamation Water Project Streamlining Act

Latest action · Feb 17, 2017 Referred to the Subcommittee on Water, Power and Oceans.

Progress

Where this bill reached, and when. A stage with no date was not reached; one that failed a vote and later carried shows the date it carried.

  1. IntroducedFeb 6, 2017
  2. Passed HouseNot reached
  3. Passed SenateNot reached
  4. To the PresidentNot reached
  5. Became lawNot reached

Summary

Bureau of Reclamation Water Project Streamlining Act

This bill sets forth provisions governing feasibility studies for water projects initiated by the Department of the Interior under the Reclamation Act of 1902 (project studies).

A project study initiated after enactment of this bill must: (1) result in the completion of a final feasibility report within three years; (2) have a maximum federal cost of $3 million; and (3) ensure that personnel from the local project area, region, and headquarters levels of the Bureau of Reclamation concurrently conduct the required review. The bill sets forth factors for extending such timeline for complex projects.

Interior, within 90 days after the initiation of a project study, must: (1) initiate the process for completing reviews, including environmental reviews, required to be completed as part of such study; (2) convene a meeting of federal, tribal, and state agencies required to act; and (3) provide information that will enable required reviews and analyses to be conducted by other agencies in a thorough and timely manner.

Interior must: (1) expedite the completion of any ongoing project study initiated before the enactment of this Act; and (2) proceed directly to preconstruction planning, engineering, and design of a project that it determines is justified.

The bill sets forth requirements applicable to: (1) project studies initiated after enactment of this Act for which an environmental impact statement is prepared under the National Environmental Policy Act of 1969 (NEPA); (2) other project studies initiated before enactment for which an environmental review process document is prepared under NEPA; and (3) any project study for the development of a non-federally owned and operated surface water storage project for which Interior determines there is a demonstrable federal interest and that is located in a river basin where other Bureau water projects are located, that will create additional water supplies that support Bureau water projects, or that will become integrated into the operation of Bureau water projects. Interior must:

  • annually prepare a list of all such studies that do not have adequate funding for study completion;
  • develop and implement a coordinated environmental review process for the development of such studies;
  • identify early all federal, state, and local government agencies and Indian tribes that may have jurisdiction and that may be required to act, which the federal lead agency shall invite to become participating or cooperating agencies;
  • issue guidance regarding the use of programmatic approaches to carry out the environmental review process; and
  • establish an electronic database and issue reporting requirements to make publicly available the status and progress with respect to compliance with applicable NEPA requirements and other action required for a project study.

The bill sets forth the authorities and responsibilities of the joint lead agency, which may be a project sponsor, and the federal lead agency in the environmental review process, including: (1) the preparation and use of environmental documents; (2) establishing a plan for coordinating public and agency participation; (3) working with cooperating and participating agencies to identify and resolve issues that could delay process completion or result in the denial of any approval required for the project study; and (4) establishing, upon request, memoranda of agreement with the project sponsor, Indian tribes, and state and local governments to carry out the early coordination activities.

The bill: (1) requires a federal lead agency to serve in that capacity for the entirety of all non-federal projects that will be integrated into a larger system owned, operated, or administered by the Bureau; (2) directs Interior, upon determining that a project can be expedited by a non-federal sponsor and that there is a demonstrable federal interest in expediting the project, to advance it as a non-federal project; (3) requires a federal jurisdictional agency to complete any required approval or decision for the environmental review process on an expeditious basis; and (4) provides for a reduction of funds for such an agency that fails to render such a decision by a specified deadline.

Interior must: (1) survey the use by the Bureau of categorical exclusions in projects since 2005 and propose a new categorical exclusion for a category of activities if merited, and (2) establish a program to measure and report on progress made toward improving and expediting the planning and environmental review process.

Interior must develop and submit annually a Report to Congress on Future Water Project Development that identifies: (1) the costs and benefits of, the non-federal interests associated with, and the support for project reports, proposed project studies, and proposed modifications to authorized projects and project studies that are related to the missions and authorities of the Bureau, that require specific congressional authorization, that have not been congressionally authorized, that have not been included in any previous annual report, and that, if authorized, could be carried out by the Bureau; and (2) any project study that was expedited under this bill.

The Water Infrastructure Improvements for the Nation Act is amended to make provisions regarding storage and other water supply projects inapplicable to any project under this bill.

Cosponsors

Members who signed on, in the order they did.

No cosponsors are on file for this measure.

Committees 1

Where it was sent and what each committee and subcommittee did with it, in order.

ChamberCommitteeWhat it did
HouseNatural Resources Committee
Referred Feb 6, 2017
Water, Wildlife and Fisheries Subcommittee
Referred Feb 17, 2017

Actions 4

Everything that happened, newest first.

  1. Feb 17, 2017Referred to the Subcommittee on Water, Power and Oceans.
  2. Feb 6, 2017Introduced in House
  3. Feb 6, 2017Sponsor introductory remarks on measure. (CR E150)
  4. Feb 6, 2017Referred to the House Committee on Natural Resources.

In the Congressional Record 1

Days the Record’s own index lists this bill, newest first, with the pages and the members it names. Pages starting H are the House, S the Senate, E Extensions of Remarks.

WhereIn the RecordMembersDate
ExtensionsDebate and remarks E150Dan Newhouse R-WAFeb 6, 2017

Research

What has been written about this bill: committee reports, cost estimates, the sponsor’s authority statement, printed hearings and the Congressional Research Service’s work.

Constitutional authority

Congress has the power to enact this legislation pursuant to the following: Article I, Section 8, Clause 18 of the United States Constitution

The sponsor’s statement, as printed in the Congressional Record, vol. 163, no. 20, February 6, 2017, page H1012.

Printed hearings 1

Hearings whose printed record names this bill, newest first: hearings on it, and wider hearings where it came up.

CRS reports 2

Congressional Research Service work that CRS links to this bill or the law it became, newest first.

Cite it 2

Products on other subjects that cite it, usually among other measures.

ProductTitleKindPublished
IF10806Bureau of Reclamation Project Authorization and Financing ArchivedResourceJan 11, 2018
R44889H.R. 23, the Gaining Responsibility on Water Act of 2017 (GROW Act)ReportJul 11, 2017

Related bills 2

Companion bills and other measures the record links to this one.

BillTitleRelationshipLatest action
HR 23Gaining Responsibility on Water Act of 2017Related billJul 18, 2017
HR 4419Bureau of Reclamation and Bureau of Indian Affairs Water Project Streamlining ActRelated billNov 2, 2018

Titles 2

Every title it has carried, official and short, at each stage.

Official Title as Introduced
To facilitate and streamline the Bureau of Reclamation process for creating or expanding water storage, rural water supply, and water recycling projects under Reclamation law, and for other purposes.
Short Titles as Introduced
Bureau of Reclamation Water Project Streamlining Act

Subjects

Assigned by the Library of Congress. Policy area: Water Resources Development.

Text 1

Each version as it was printed, newest first.

  1. Feb 6, 2017Introduced in House

Support LegiList

This page is free, carries no paywall, and is built and maintained by one person. If the record here is useful to you, a few dollars keeps it going.

Processed by Stripe in a separate window. LegiList never sees card details. Other amounts

Everything here is as published by Congress: the summary is the Congressional Research Service's, the action wording is the clerks', and the subjects are the Library of Congress's. How far it got is read from the actions themselves, taking the most recent one of each kind, so a bill that failed a vote and later passed is shown as having passed. Records come from this bill on Congress.gov and govinfo.gov; cost estimates are the Congressional Budget Office's, and the hearings are the printed hearings GovInfo publishes, which can appear months after the hearing.