North Carolina Senate bill in Session 2025.
Status: in_committee. Latest action: March 25, 2025.
DOT Permit Review Time Periods.
Amends Article 7 of Chapter 136 by enacting new, GS 136-93.1B that details the permit review process for driveway, encroachment, and subdivision permits. Requires that the Department of Transportation (DOT) notify an applicant that their permit application is complete or incomplete within 10 business days of receiving an application for certain permits. Includes permits pertaining to driveway connections; encroachment; traffic control devices; openings, structures, pipes, or trees; and subdivisions (GS 136-18(29), GS 136-18(37), GS 136-30, GS 136-93, and GS 136-102.6, respectively). Notification is not required if DOT issues the permit or denies the application providing a proper signed, written report within the 10-day period. Details written report requirements.
| Date | Event | Detail |
|---|---|---|
| 2025-03-24 | Introduced | Bill introduced |
| 2025-03-25 | Status | in_committee |
| 2025-03-25 | Latest Action | Ref To Com On Rules and Operations of the Senate |