Need all Congresses? Press Enter for expanded results.

SB 742

California - Session 2025-2026

Senate introduced 2026-01-26
Bill Details

Title: Electricity: electrical infrastructure: permanently abandoned transmission facilities: emergency response: liaisons.

Summary

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires electrical corporations to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire, as specified. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. This bill would require the commission, on or before January 1, 2028, to update a general order to require each electrical corporation to remove all permanently abandoned transmission facilities, as specified. This bill would require that an electrical corporation’s wildfire mitigation plan also include an accounting of all transmission facilities, including permanently abandoned transmission facilities, and include a plan for how and when each permanently abandoned transmission facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, as provided. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing this bill’s requirements would be a crime, the bill would impose a state-mandated local program. Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. This bill would require certain electrical corporations and local publicly owned electric utilities, in cooperation with OES and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign liaison representatives to work with each local emergency operations center, as provided. By imposing new duties on local publicly owned electric utilities, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for specified reasons.

Sponsor
Pérez
Official Source Back to Bills
Support LegiList

Tracking state legislation? Support LegiList with a small contribution. Independent, ad-free, and built by one developer.

Payments are processed securely by Stripe in a separate window. LegiList never stores card details.
Actions Timeline
Date Event Detail
2025-02-21 Introduced Bill introduced
2026-01-26 Status introduced
2026-01-26 Latest Action In Assembly. Read first time. Held at Desk.
More Bills In Similar Categories
Bill Title Status
SB 1020 State of emergency: Governor’s powers and termination. in_committee
AB 1981 Subsidized childcare: reimbursement rates: reporting. in_committee
AB 2477 Structural pest control. in_committee
AB 2492 Public safety: mega sporting events. in_committee
AB 2574 Potentially dangerous and vicious dogs: hearings: appeal: notice of owner’s or keeper’s rights. in_committee
AB 2795 Financial institutions: franchises, state funds, and securities. in_committee
SB 1446 Incarcerated persons: release and parole. unknown
ACA 19 Parole. in_committee